πŸ”΅ Spacers, Sleeves & Bushings

Capabilities at a Glance

Every number below is what we hold on your parts β€” CMM-verified, with free FAI on your first order.

ToleranceΒ±0.005mm on critical dimensions
MaterialsSteel 1018/1045 Β· Stainless 303/304 Β· Aluminum 6061 Β· Brass. Full material certs available on request.
ProcessTurning + Milling
Surface FinishBead Blasting Β· Passivation Β· Anodizing (available on request)
InspectionCMM Β· Messprotokoll (Istwerte) Β· kostenlose FAI
Lead Time2.5–4 months for production; prototypes in 5–7 business days. DDP door-to-door with one invoice.

Frequently Asked Questions

  • What parts do you machine in this category?

    Tubular spacer sleeves, precision bushings, L-brackets, mounting bases, standoffs, step spacers and shoulder bolts with concentricity-critical geometry.

  • What tolerances do you hold on bore/OD concentricity?

    Β±0.005mm on critical dimensions; concentricity between bore and OD is verified on the CMM between centers with full reports.

  • What materials do you machine for spacers and bushings?

    Steel 1018/1045, stainless 303/304, aluminum 6061 and brass β€” with material certs available on request.

  • How do you deburr and finish small tubular parts?

    Parts are deburred inside and out (including cross holes), then finished per spec β€” bead blast, passivation or anodizing as required.

  • Can you make precision shoulder bolts and step spacers?

    Yes. Shoulder bolts and step spacers are machined to drawing with shoulder length and diameter held to Β±0.005mm on critical features.

  • What is your lead time for spacers and bushings?

    2.5–4 months for production, prototypes in 5–7 business days. Fast track available for simple geometries.

Buyer's Guide

  • How to Get a Quote for Spacers & Bushings

    Send the drawing with: bore/OD sizes and tolerances, length, material, surface finish, and quantity. Small parts quote fast β€” batch pricing improves with volume.

  • Material Selection Guide

    Steel 1018/1045 for strength, stainless 303/304 for corrosion, aluminum for weight, brass for conductivity and aesthetics. Match material to load and environment.

  • DFM Tips for Tubular Parts

    Specify concentricity as a callout with datum, keep wall thickness practical for the length, and allow for deburring on cross holes.

  • Quality & Inspection

    CMM inspection with full report, concentricity verified, measured values, free FAI. Full dimensional check on every lot.

  • Lead Time & Shipping

    Prototypes 5–7 business days, production 2.5–4 months. DDP door-to-door with one invoice β€” export, customs, duties, last-mile.

Get a Quote for Spacers, Sleeves & Bushings

Send us your drawing β€” we review within 48h and return a quote with lead time.

Get a Quote β†’